Our custom vanity is now being installed. Custom Woodworking built the vanity after we ordered it through Dominic at Taps. It is all white with a marble counter top. It will take a few days as the under mount sink is siliconed, handles are installed, mirror hung etc… In addition […]
Entries from May 2009
Bathroom vanity is beginning to be installed
May 29th, 2009 · 9 Comments
Tags: Bathroom
Basement bathroom minutes away from being finished
May 23rd, 2009 · 4 Comments
Meanwhile the basement bathroom is nearly complete as well.
All that is left is for Jim to finish painting the baseboards, door and rad.
We didn’t have a lot of luck finding a paint colour we were both happy with. It took some “negotiation”. In the end we landed on a dark grey that adds […]
Tags: Bathroom
Fixtures and glass door installed in the second floor bathroom
May 23rd, 2009 · 1 Comment
A lot has happened since our last update.
The glass that we had ordered from Taps was delivered and installed by Doors and More. It basically splits the bathtub area into thirds. One third is a fixed piece of glass, one third is a door on hinges and one third is left open. […]
Tags: Bathroom
Basement nearly complete
May 13th, 2009 · 3 Comments
Well, well, well. Just under three months later we are 95% done the basement renovation. Ben was busy throughout the weekend installing the doors, finishing the trim and doing a massive DAP-fest to hide the nails, gaps, etc…
From there we were busy cleaning things and beginning to organize the clutter. Feels good to be getting […]
Tags: Basement
Installing glass for the basement shower
May 5th, 2009 · 9 Comments
A couple of days ago we went to East End Glass to pick up the custom piece of glass we had ordered for the basement shower. The piece is about 3 feet high and 3 1/2 feet wide. It is 3/8″ thick. It was very reasonable ($130).
A friend of ours is a designer and one […]
Tags: Bathroom