Tiling and grout complete in the downstairs bathroom

March 31st, 2009 · 1 Comment

Last night Harold completed the grout in the downstairs bathroom. We’re inching our way closer!

Also now that the tiling was complete, we gathered exact measurements for the piece of glass that we need. Harold told us about East End Glass where we could order a specific piece of glass to be cut. Ben called them for us and determined that our piece of glass (roughly 3×3) will be $130 plus tax. Ben will then install it. We’re just determining what kind of look we want for the channels that need to hold the glass in place.

Left to do for the shower: a. polish the grout lines and seal the tile, b. install the rain head and the pressure valve control, c. install the pot light, d. install our upstairs shower curtain until the glass arrives in two weeks.

Here’s how it looks so far:

Basement shower with grout