March 31st, 2009 · 1 Comment
The laundry room is beginning to take shape. The floor has been installed and sealed and Ben is finished the drywall and plumbing.
We’ve also received the new Kenmore elite set of washer/dryer from our guy Sastri at Sears. We took advantage of the deep discounting going on right now.
Left to do in this […]
[Read more →]
Tags: Laundry room
March 31st, 2009 · 1 Comment
Last night Harold completed the grout in the downstairs bathroom. We’re inching our way closer!
Also now that the tiling was complete, we gathered exact measurements for the piece of glass that we need. Harold told us about East End Glass where we could order a specific piece of glass to be cut. […]
[Read more →]
Tags: Bathroom
Harold has been slotting us into the evenings this week as he was booked solid on another job. That means we’re not moving as fast as we’d like…but then again at least we’re moving forward.
We expect the shower to be complete (including grout) by Sunday. We’re a little behind schedule but it looks […]
[Read more →]
Tags: Tiles · Bathroom
I’d be lying if I didn’t admit that this phase of our reno has been tough.
I’m not sure if we weren’t ready for it or if we’ve taken on too much all at once. But we are struggling with the constant dirt, interruption and some of the issues with the trades. Added to […]
[Read more →]
Tags: General comments
Harold was back today and made some good progress.
He completed the laundry room floor (minus the grout) and made some progress starting the subway tiles in the basement shower.
[Read more →]
Tags: Tiles · Bathroom